Schedule Realism
Severely Under-scheduledSchedule is unrealistic. Needs 15%+ more time to be achievable.
Recommendation: Schedule needs major revision. Add 15%+ time or review route.
Ratio: 1.4 (actual time / scheduled time)
System Comparison
Excellent - Top 10%Route ranks #5 out of 51 routes (92th percentile)
Route performance: 73.3% on-time
System median: 52% on-time (+21.3pp)
Stop-Level Reliability by Direction
Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ outbound, โ inbound).
Route Analysis
Route 50 averages 73.3% on-time performance over the last 30 days, earning a grade of C.