Evergreen / City Centre
Evergreen / City Centre
Schedule Realism
Severely Under-scheduledSchedule is unrealistic. Needs 15%+ more time to be achievable.
Recommendation: Schedule needs major revision. Add 15%+ time or review route.
Ratio: 1.19 (actual time / scheduled time)
System Comparison
Poor - Bottom 25%Route ranks #43 out of 51 routes (16th percentile)
Route performance: 37.2% on-time
System median: 52% on-time (-14.8pp)
โ ๏ธ This route is significantly underperforming compared to the system average. Review schedule realism and stop-level reliability above for root causes.
Stop-Level Reliability by Direction
Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ outbound, โ inbound).
Route Analysis
Route 43 averages 37.2% on-time performance over the last 30 days, earning a grade of F.