43
30-Day Grade
F

Evergreen / City Centre

Loading vehicles...
30-Day Average
37.2%
Over 15 days
Best Day
47%
Mar 26
Worst Day
22.2%
Mar 10
Variability
24.8%
Performance range
๐Ÿšจ

Schedule Realism

Severely Under-scheduled

Schedule is unrealistic. Needs 15%+ more time to be achievable.

Recommendation: Schedule needs major revision. Add 15%+ time or review route.

Ratio: 1.19 (actual time / scheduled time)

โš ๏ธ

System Comparison

Poor - Bottom 25%

Route ranks #43 out of 51 routes (16th percentile)

Route performance: 37.2% on-time

System median: 52% on-time (-14.8pp)

โš ๏ธ This route is significantly underperforming compared to the system average. Review schedule realism and stop-level reliability above for root causes.

Stop-Level Reliability by Direction

Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ†“ outbound, โ†‘ inbound).

Route Analysis

Route 43 averages 37.2% on-time performance over the last 30 days, earning a grade of F.

View weather impact analysis โ†’