29
30-Day Grade
F

Brighton / University

Loading vehicles...
30-Day Average
43.1%
Over 15 days
Best Day
47.3%
Mar 23
Worst Day
39.1%
Mar 10
Variability
8.2%
Performance range
๐Ÿšจ

Schedule Realism

Severely Under-scheduled

Schedule is unrealistic. Needs 15%+ more time to be achievable.

Recommendation: Schedule needs major revision. Add 15%+ time or review route.

Ratio: 1.54 (actual time / scheduled time)

๐Ÿ“‰

System Comparison

Below Average - Bottom 50%

Route ranks #38 out of 51 routes (26th percentile)

Route performance: 43.1% on-time

System median: 52% on-time (-8.9pp)

Stop-Level Reliability by Direction

Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ†“ outbound, โ†‘ inbound).

Route Analysis

Route 29 averages 43.1% on-time performance over the last 30 days, earning a grade of F.

View weather impact analysis โ†’