SaskTel Centre
SaskTel Centre
Schedule Realism
Severely Under-scheduledSchedule is unrealistic. Needs 15%+ more time to be achievable.
Recommendation: Schedule needs major revision. Add 15%+ time or review route.
Ratio: 2.1 (actual time / scheduled time)
Stop-Level Reliability by Direction
Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ outbound, โ inbound).
Route Analysis
Route 25 averages 29.2% on-time performance over the last 30 days, earning a grade of F.