Stonebridge / Lawson
Stonebridge / Lawson
Schedule Realism
Severely Under-scheduledSchedule is unrealistic. Needs 15%+ more time to be achievable.
Recommendation: Schedule needs major revision. Add 15%+ time or review route.
Ratio: 1.23 (actual time / scheduled time)
System Comparison
Below Average - Bottom 50%Route ranks #32 out of 51 routes (38th percentile)
Route performance: 47.6% on-time
System median: 55.5% on-time (-8pp)
Route Analysis
Route 17 averages 47.6% on-time performance over the last 30 days, earning a grade of F.